Toilets & Drains

Residents: Please refrain from disposing of items such as wipes (even flush-able wipes), nappies, paper towel or any other foreign objects down the toilets or drains. It can have quite an adverse effect on the plumbing and be very expensive to fix.

Ensure you dispose of such items in the general waste, which is now collected four times a week.

SNAP!

Create and store an asset list of property serial numbers for free! If an item is lost or stolen, you can access this secure online serial number list, from anywhere, at any time. Recording serial numbers in advance offers peace of mind if burglary occurs. It can assist the police and your contents insurance claim, and makes it easier to track your stolen property. Protect your property now!

Serial Number Asset Partnership (snap.org.nz)

Bike Thefts

Residents: Please ensure bikes are secured with a decent lock and chain. Two bikes have recently been taken from under the stairs of A Block. If you see anyone acting suspiciously, please notify the Committee, Oxygen, or Police in the first instance.

Now’s a good time to:

  • Take a photo of your bike
  • Note down any serial numbers or unique identifiers
  • Update your insurance records
  • Check the sturdiness of your lock and chain
  • Register your bike’s details on NZ Police’s Free SNAP Serial Number Action Project (Operation SNAP) website.

Body Corporate FAQs

You are the Body Corporate

As a unit title owner you are part of the body corporate for our home here in Newtown and as such, as well as having direct responsibility for looking after the inside of your own property, you are also part of a collective group responsible for the complex’s management, use of body corporate funds and upholding of the collective body corporate agreement (the body corporate rules).  Operation and maintenance of the complex and shared facilities is the job of the body corporate.

A body corporate comprises all the owners of a unit title complex. It is not something that you can opt out of.

Any Body Corporate is governed by the provisions of the Unit Titles Act 2010 – with amendments in 2013 and Unit Titles Regulations 2011 (“the Act”).

The Act sets out rules for the use and management of the units and all common property that is owned by all the owners but is the responsibility of the body corporate.

A set of “founding” body rules was set (link to the current rules) and a professional body corporate manager (Oxygen) was appointed by the Developers (CGW Limited). A meeting was held at the end of October 2020 which was the first Annual General Meeting at which a body corporate committee (your committee) was established from the owners of Blocks A and B who had taken possession at that time.

What is the owners committee?

Once there are ten or more units occupied, the Act says they must elect a committee – only unit title owners may be elected to be on the committee. At the time of the election only blocks A and B were occupied, so at present the committee is made up of owners from those two blocks

Another Body Corporate Annual General Meeting is planned for the end of the financial year (April 2021), at which point we would welcome additional representation from the other completed and occupied Blocks.

What does the body corporate do?

The Body Corporate and the committee are responsible for a range of compulsory and additional activities. For example, it is required to:

  • Ensure that the complex has adequate insurance
  • Have a long term maintenance plan for the complex to maintain its buildings and grounds
  • Set the annual levy and ensure that all the required accounting/auditing is done
  • Employment of the body corporate manager and any other contracting services required.

The role of the owners committee may vary. Some can be very “hands on” sharing jobs around. An active owners committee with a range of professional skills may take a lead role in many activities.  We believe that an active committee will help establish an attractive, friendly and smoothly run place where we all live and build a strong community as well as looking after our investment (our home).

What do Oxygen do? (the professional body corporate management)

In January 2020 the developers (CGW Limited) set up a two year agreement with Oxygen Strata Limited in accordance with the UTA 2010 and the Unit Titles Regulations 2011 to enter into a Service Agreement with a Body Corporate Management. There role is to assist the body corporate to meet its legislative and financial obligations (in summary)

  • General Secretarial Duties
  • Preparing and documenting the Annual General Meeting for the body corporate
  • Getting insurance for the complex
  • Repairs and maintenance quotes
  • Maintaining appropriate financial records

Defect Remediation

It’s inevitable that there will be some teething issues with new builds – fortunately these sorts of thing are covered under warranty, and while the developers are on site it’s reasonably easy to get these rectified.

There has been a lot of confusion around the process for this, hopefully this post contains all the details needed to get in touch with the right person and get the issue rectified ASAP. It will be updated over time by the committee as we get more details.

We’ve been asked not to contact the construction company (CGW Limited) directly any more – any issues inside your property should be raised directly with the sub contractor responsible, or with the developer via their solicitor. Any external issues should be raised with the Body Corporate Committee, who will in turn raise it with the developer directly.

Appliances:
Harvey Norman
Kevin Leggott:
  Phone: 021 500 347

Blinds:
Taylor Made Blinds
Cam:
  Email: [email protected]
  Phone: 021 190 9711
Carmen:
  Phone:021 973 884

Electrical and Air ducting:
NME Electrical
  Email: [email protected]
  Phone: 04 589 0310

Floors:
Flooring Xtra
Jordan Dallimore:
  Phone: 027 541 9315

Kitchen:
Mastercraft Kitchens
Shane Peebles:
  Email: [email protected]
  Phone: 04 576 9348

Landscaping:
Aspen Landscapes
Stuart Baines:
  Web: http://www.aspenlandscapes.co.nz
  Phone: 04 472 0448

Plumbing:
Blackwood Plumbers
Josh Blackwood:
  Email: [email protected]
  Phone: 027 663 4883

Structure/Paint
Developers via Solicitor
Morrison Kent Ltd:
  Email: [email protected]
  Phone: +64 4 4720020
  Fax: +64 4 4727017

Construction company:
CGW Limited
Susan:
  Email: [email protected]
  Phone: 027 494 7308

Bins and Things

The cardboard recycling bin finally arrived last week (Yay!). We are waiting for the Developer to mend the latch on the fire door before we can store it inside next to the general waste bin.

In the interim we have placed the cardboard recycling bin outside.

Rubbish collection is:

  • Mondays
  • Thursdays
  • Saturdays

Cardboard Recycling (Please remember to cut your cardboard down flat.)

  • Wednesdays

Plastics and Glass Bottles

  • Thursdays